吴忠宝, 康丽侠, 王改娥. 三维地质建模及油藏数值模拟一体化剩余油分布规律研究[J]. 地质与资源, 2006, 15(4): 315-320. DOI: 10.13686/j.cnki.dzyzy.2006.04.015
    引用本文: 吴忠宝, 康丽侠, 王改娥. 三维地质建模及油藏数值模拟一体化剩余油分布规律研究[J]. 地质与资源, 2006, 15(4): 315-320. DOI: 10.13686/j.cnki.dzyzy.2006.04.015
    WU Zhong-bao, KANG Li-xia, WANG Gai-e. STUDT ON THE RESIDUAL OIL DISTRIBUTION REGULARITY BY INTEGRATED 3-D GEOLOGICAL MODELING WITH RESERVOIR NUMERICAL SIMULATION[J]. Geology and Resources, 2006, 15(4): 315-320. DOI: 10.13686/j.cnki.dzyzy.2006.04.015
    Citation: WU Zhong-bao, KANG Li-xia, WANG Gai-e. STUDT ON THE RESIDUAL OIL DISTRIBUTION REGULARITY BY INTEGRATED 3-D GEOLOGICAL MODELING WITH RESERVOIR NUMERICAL SIMULATION[J]. Geology and Resources, 2006, 15(4): 315-320. DOI: 10.13686/j.cnki.dzyzy.2006.04.015

    三维地质建模及油藏数值模拟一体化剩余油分布规律研究

    STUDT ON THE RESIDUAL OIL DISTRIBUTION REGULARITY BY INTEGRATED 3-D GEOLOGICAL MODELING WITH RESERVOIR NUMERICAL SIMULATION

    • 摘要: 剩余油分布规律研究一直是中后期油田开发的研究重点和难点,研究方法也多种多样.针对马岭油田中一区的开发特点,采用三维地质建模和油藏数值模拟一体化技术研究思路,在构造特征研究、精细地层对比、沉积相研究和流动单元研究的基础上,建立了中一区延长组到富县组的三维立体地质模型,从而为油藏数值模拟提供了初始静态地质模型.在历史拟合的基础上通过精细油藏模拟方法进行了油藏剩余油分布模拟计算,并结合沉积相和流动单元分析了剩余油分布规律,从而为油田下步方案调整提供了挖潜方向.

       

      Abstract: Study on the residual oil distribution regularity is often of importance and difficulty during the middle and late period of oil field production. According to the production patterns in the M-1 area of Maling Oil Field, we make use of the technology of integrated 3-D geological modeling with reservoir numerical simulation. After the study of trap, fine layer comparison, deposition facies and flowing unit, a 3-D geological model for the M-1 area is established from Yanchang formation to Fuxian formation, which supplies an original geological model for the reservoir numerical simulation. Based on a successful history regression, the residual oil distribution is calculated with reservoir simulation. Finally, we analyze the residual oil distribution regularity combining with study of deposition facies and flowing units. As a result, the potential of the oil field and the adjusting direction for next production is determined.

       

    /

    返回文章
    返回