李勇, 孙喜峰, 李廷. 隧道施工地质超前预报方法[J]. 地质与资源, 2004, 13(2): 119-122.
    引用本文: 李勇, 孙喜峰, 李廷. 隧道施工地质超前预报方法[J]. 地质与资源, 2004, 13(2): 119-122.
    LI Yong, SUN Xi-feng, LI Ting. METHODS OF GEOLOGICAL PREDICTION IN TUNNEL ENGINEERING[J]. Geology and Resources, 2004, 13(2): 119-122.
    Citation: LI Yong, SUN Xi-feng, LI Ting. METHODS OF GEOLOGICAL PREDICTION IN TUNNEL ENGINEERING[J]. Geology and Resources, 2004, 13(2): 119-122.

    隧道施工地质超前预报方法

    METHODS OF GEOLOGICAL PREDICTION IN TUNNEL ENGINEERING

    • 摘要: 隧道施工地质超前预报是一项多种方法的综合运用,对预防异常情况及掌子面前方不良地质体的存在具有重要意义,其有利于安全施工、提高效率、缩短工期、避免事故,具有较大的社会效益和经济效益.通过合理组织预报作业流程、采用多种方法和对预测结果进行综合分析,能够提供更为准确的相关信息.

       

      Abstract: The geological prediction in tunnel engineering is a comprehensive application of multiple methods. It is significant to prevent and deal with abnormal situations and the existence of unfavorable geologic bodies ahead of the faces.The prediction is favorable for safely constructing, improving efficiency, reducing construction period and avoiding accidents, with great economic and social benefits.The accurate information can be provided by a reasonable organization of predicting procedure and a comprehensive analysis on the predicted results with multiple methods.

       

    /